Compiled designs and producing construction drawings for the construction of the new 750 mm Ø steel water pipeline (M12) that replaced the existing 13.75 km x 203 mm diameter steel water pipeline (M2) routed from Servaas Train Station (near Nigel) to Heidelberg. In addition to the new bulk water line, the designs also include concrete chambers, road crossings, river crossings, and surge analysis.
Our services also included full-time site supervision for design compliance during construction.